Das Facility Replacement – Critical Piping Systems EPC Work
Client:
ADNOC Offshore

Lead Division:
Mechanical Oil and Gas Division
Client:
ADNOC Offshore
Location:
Das Island, Abu Dhabi
Start Year:
2023
Project Status:
Under Construction
Completion Year:
2026
Replace Piping systems with zero shutdown or minimum shutdown with optimum Flaring Optimize the new network and piping routing considering the future production
.avif)