Closed Drain System at Abqiq Plant
Client:
Saudi Aramco

Lead Division:
Mechanical Oil and Gas Division
Client:
Saudi Aramco
Location:
Saudi Arabia
Start Year:
Project Status:
Completed
Completion Year:
2020
Detailed engineering, procurement, fabrication and construction of the civil, steel structure, static and rotating mechanical equipment, piping, electrical, instrumentation and control works to upgrade the closed drain system in Abqaiq Refinery.
.avif)